Project description:

• The project includes two Siemens Gas Turbine Generators (2X V94.3A) of 250 MW and two heat recovery steam generator and one steam turbine generator FUJI (250 MW).

• Each GT feeding exhaust gases to its respective unfired heat recovery steam generator.

• Steam generated from the two HRSG, feeds one approximate 250 MW, reheat condensing steam turbine generator (STG).

• The total facility net output is approximately 750 MW when burning natural gas in the gas turbines.

• Power generated is fed to the utility grid via the 400kV, gas –insulated substation (GIS).

   

 

Location:

The Misurata combined cycle power plant (MCCP) site is located adjacent to Misurata steel complex about 8 km away from the town of Misurata, 195 km east of Tripoli City.

Project Status:

Unit 1: synchronization January 2010 (Target)

Unit 2: synchronization February 2010 (Target)